Condominium

Aspire Erawan Prime

แอสปาย เอราวัณ ไพร์ม

Mueang Samut Prakan · Samut Prakan

Project details

About this project

Aspire Erawan Prime is a condominium by AP (Thailand) Public Company Limited on Sukhumvit Road, right next to BTS Chang Erawan, in Pak Nam, Mueang Samut Prakan, Samut Prakan. It is a single building of 30 storeys with 1,275 units and 5 shops on about 6-1-63.5 rai, completed in about 2021–2022, with parking for about 40% of the units. Unit types: studios of 27 sq.m., 1-bedroom units of 27–34.5 sq.m., 1-bedroom Plus units of 35–38 sq.m. and 2-bedroom units of 46–48.5 sq.m. The common fee is THB 39 per sq.m. per month. More than 30 facilities spread over more than 3 rai: on the 7th floor a salt-water swimming pool with a jacuzzi, a children's pool, the Health Complex, game rooms, a private theatre, a yoga deck and gardens; on the roof the Sunset Parlor and a Sky Jogging track; plus a co-working cafe, a meeting room, Mingle Space, smart lockers, key-card access, CCTV and 24-hour security. It is a separate project from Aspire Erawan, AP's older building next door.

Shared facilities

  • CCTV
  • Co-working cafe
  • Health Complex (fitness)
  • Battle Room and board games
  • Gardens, lawn court and Serene Pavilion
  • Key-card access
  • Children's pool
  • Meeting room
  • Parking for about 40% of the units
  • Free-flow playground
  • Sauna and steam room
  • 24-hour security
  • Sunset Parlor and Sky Jogging track on the roof
  • Smart lockers
  • Salt-water swimming pool with a jacuzzi on the 7th floor
  • Private theatre
  • Yoga deck and stone therapy path

Location

66 Sukhumvit Road, Pak Nam, Mueang Samut Prakan, Samut Prakan 10270

Project details

Project type
Condominium
Developer
AP (Thailand) Public Company Limited
Buildings
1 buildings
Unit types
Studio 27 sq.m., 1-bedroom 27–34.5 sq.m., 1-bedroom Plus 35–38 sq.m. and 2-bedroom 46–48.5 sq.m.
Common fee
39 THB/sq.m./month

Project information is compiled from public sources and MapxProp listings. It may be incomplete or out of date; please confirm with the developer or the project’s juristic office before deciding. Last updated 17 October 2026